Skip Intro
Think Listen Create
  • Home
  • >
  • Projects
  • >
  • Orlando Police Department Headquarters and Crime Scene Facility

Orlando Police Department Headquarters and Crime Scene Facility

Orlando, FL, USA

H.J. High Construction

Orlando Police Department Headquarters and Crime Scene Facility
H.J. High Construction
Location
Orlando, FL, USA
Markets
Public Safety & Judicial
Services
Technology, Energy Services, Life Safety and Fire Protection
Project Size

96,000 square feet
(Police Headquarters)

80,000 square feet
(Crime Scene Facility)

Accolades

Crime Scene Facility, Certified LEED v2009 NC, 2017

Headquarters, Certified LEED v2009 NC, 2018

AIA Orlando, Award of Merit, 2018

Overview

The three-story headquarters includes holding cells and a sally port, spaces for administration, investigative, patrol and special services. An existing building was repurposed into the crime scene facility, located at the Orlando Executive Airport. It includes a secure property and evidence unit storage, crime scene unit processing labs, training components, and storage spaces.

H.J. High Construction

Features

Energy conservation strategies developed by TLC include occupancy-based lighting control system and LED lamps that use 20% less power than fluorescent lighting, variable refrigerant flow and variable speed drives, and high-efficiency plumbing fixtures that use 25% less water than a comparable building.

H.J. High Construction