Contact
Image Courtesy: Keith Douglas
Image Courtesy: Keith Douglas

Brighton Public Safety Complex

96,000 FT2
Brighton, FL, USA
Government
Mechanical, Electrical, Plumbing / Life Safety and Fire Protection / Technology
Project list

Overview

Located on the Tribe’s Reservation, the design pays homage to the importance of the land and nature and was designed to accommodate several large trees on the site. The campus provides offices for the Tribal Services administration center, police department, fire department and associated living facilities, including a dormitory and an emergency operations center.

Features

TLC engineered the MEP systems with sufficient redundancy and back-up systems to continue operation through weather-related or other events. Our engineers met with department representatives in a series of user group workshops. Meticulous coordination was required to integrate the building systems and demands unique to each operating department as well as to achieve energy and water-efficient operation.