Overview
The occupancy of this building was delayed due to water intrusion and mold issues. TLC addressed the concerns of GSA and worked closely with them to make the building a healthy, sustainable, and inhabitable.
Features
TLC designed physical security and blast resistance; compliance with current wind criteria for new façade, windows, and roof systems; new voice activated fire alarm and replacement of fire pump and sprinkler system; BAS/EMA control system; energy modeling to identify energy effective strategies, LEED potential and assessment; and new lighting control system and occupancy sensors.