Overview
The new 90,000 sf international passenger terminal will accommodates both commercial and general aviation international arrivals. Phasing was required to maintain existing operations during construction of the new facility. Temporary corridors (passenger and sterile) between the old and new terminal buildings were used until the new terminal was completed. TLC provided design and construction support services for the technology systems including the Federal Inspection Services (FIS) facility and expanded security checkpoint.
Features
TLC designed the following systems: Voice and Data Network, Wi-Fi, Cellular Distributed Antenna System (DAS), UHF/VHF Radio, Trunked Radio Systems, Airport Operations Database (AODB), Video Surveillance, Access Control System (ACS), Intrusion Detection Master Antenna Television (MATV), Common Use Passenger Processing Systems (CUPPS), Electronic Visual Display (EVIDS), and Pathway and Data Connectivity to Baggage Handling System (BHS).