Overview
The project included a 4-gate expansion of Denver International Airport’s existing Concourse B. The 4-level, 89,000 sf expansion provides six new holdrooms, a new international Arrivals FIS corridor to connect to the existing customs hall, a full basement and gates for both domestic and international air carriers. The adjacent aircraft apron was also expanded. This project is part of an overall expansion to provide an additional twenty-six gates to the airport’s existing three concourses. The project achieved the Leadership in Energy and Environmental Design (LEED) Gold certification.
Features
TLC designed the following systems: Premise Distribution Systems (PDS), Voice / Data Networks, Wired and Wireless (Wi-Fi), Distributed Antenna Systems (DAS), Access Control Systems, Video Surveillance, Security Intercom Systems, Electronic Visual Information Display Systems (EVIDS), Passenger Processing Systems, Public Address System, and Master Antenna Television (MATV).