Contact
Image Courtesy: Ben Tanner
Image Courtesy: Ben Tanner
Image Courtesy: Ben Tanner

AdventHealth Celebration Health Patient Tower

234,000 FT2
Celebration, FL, USA
Healthcare / Hospitals / Inpatient Facilities / High Performance Healthcare / Building Resilience in Healthcare
Mechanical, Electrical, Plumbing / Technology / Commissioning

Certified LEED v2.2 NC Silver, 2012

USGBC Central Florida Chapter, Outstanding LEED NC Project, 2012

ABC Central Florida Chapter, Excellence in Construction, Eagle Award and Project of the Year Award, 2012

Project list

Overview

The patient tower expansion meets the local demand for health care and also the increasing number of patients served by AdventHealth Celebration. The six-story, 120-bed patient tower with a five-story ancillary support addition houses an expanded emergency department, laboratory, pharmacy, patient rooms and includes staff offices, support spaces and a mechanical penthouse.

Features

The patient tower is the first of AdventHealth’s facilities to achieve LEED Silver certification, surpassing the original goal of basic certification. The tower achieves over 50% reduction in lighting power. Energy-efficient design measures result in an overall energy cost savings of 14%, equating to more than $110,000 in annual energy savings.